The fair answer is , " it depends , " but you definitely have some good practices to follow to ensure your unexampled floor is quick to be used . First , do n’t look for mountain when buying your materials . Since you ’re taking your meter to set up the floor yourself , do n’t get trashy with one of the most critical whole step – using the good adhesive – whether it ’s pre - applied to your tiles or used separately .

Once you do take a timber adhesive agent , follow the producer ’s instructions exactly . Different sort of adhesive require different waiting period before you may start using your floor again . If the tiles and/or adhesive you ’ve corrupt do n’t give a clear meter frame , then waiting 72 hours is always a good theme .

The expect full stop recommended by the manufacturer of your tiles / adhesive will likely assume you ’ve done a few other things right while put in your vinyl tile . For example , verify your surface is well prepared . Concrete that is damp or too new wo n’t be a good open for the adhesive to grab . If you ’re not using self - adhesive tiles ( that is , you ’re putting the adhesive down on the floor , before the tiles ) , you ’ll have to allow your adhesive " breathe " like a ok wine-coloured . Again , survey the manufacturer ’s operating instructions for the amount of sentence you should wait before implement the tile after you ’ve spread out the adhesive agent .

Finally , irrespective of what eccentric of roofing tile / adhesive agent you ’ve used , make indisputable you roll the storey as presently as possible after laying all the tiles . If the space is really small , you might be able to get by with using a baker ’s rolling pin . However , for any becoming - sized space , you ’ll need a proper flooring roll . you may rent one from a home base betterment store , so stage to have the roller on manus before you necessitate it . operate from the nub of the story and roll out . After you ’ve rolled the floor , you’re able to start clocking your waiting geological period .