Key Takeaways
The fastest elbow room to get a raw ceiling is to put in ceiling tile straight to an existing drywall cap . If the ceiling surface is n’t sound or has overt joist ( a horizontal supporting component that unremarkably persist from wall to wall ) , staple the tiles to furring strips ( thin airstrip of woods used to endure the finished Earth’s surface of a room ) . Alternately , you may be capable to frown the cap with a suspend ceiling system if the cap is high enough .
To set how much roofing tile you need , multiply the room ’s duration by its breadth to get the square footage , then tot up about 10 per centum for trimming and errors . To figure how many box of tile you involve , fraction the square footage by the number of square foot of tile in a box . If the room is not square or rectangular , draw a vignette of the room on graph composition , using each square on the newspaper to defend one square understructure . Then look the public square to set how many tiles you need .
Installing Tile With Adhesive
To apply tile directly to the exist ceiling airfoil with adhesive :
stone’s throw 1 : To find the center of the ceiling , measure and strike out the midpoint of each wall . Stretch a trash - boxwood line between diametric midpoints and snap the chalk parentage . Repeat in the other direction . The center is where the lines cross . employ a carpenter ' foursquare to check that the rail line take shape 90 - point angles .
Step 2 : Measure the ceiling to determine the breadth of the tiles that will go around the edges of the elbow room . To calculate the breadth of the border tiles , note the inches measure past the last full foot in each focussing – 5 inches , for example , from 17 foot 5 in . Add 12 inches – the breadth of one full tile – and divide by 2 . The result is the width of the border roofing tile at each final stage of each row of roofing tile laid in that direction . For model , if the inch measurement is 5 , delimitation tiles in row across the focus measured will be 8 1/2 in wide . Calculate the breadth of border tiles along both direction .
Step 3 : commence in one niche of the room , evaluate out the breadth of the border tiles in each direction and marking these points on the ceiling . Snap a chalk line on the ceiling at a right angle through each of these points , making sure each of the two new lines is parallel to one of the crank telephone line across the core of the ceiling .
whole tone 4 : Set the turning point tile first . Mark it to the careful size with a pencil . veer the first tile , confront up , with a shrewd utility tongue and a straightedge . cap tiles are made to engage together , with two well-grooved edges and two tongue edges . The tongued bound of the starter roofing tile must face toward the substance of the room , so cut the well-grooved sharpness to reduce the turning point tile to size . The borderline tile along the two starter walls will be trimmed along a well-grooved edge . The tiles frame the two far wall will be switch off along the tongue edge .
footfall 5 : lend oneself adhesive to the back of the trimmed corner tile with a putty tongue , put daubs of adhesive in the shopping center of the roofing tile and about 1 1/2 inches in front of each corner . put the tile into the corner , tongued edges out , and slide it into emplacement exactly within the two chalked tune . Press it hard into place .
footfall 6 : Cut border tile to work out from the corner tile along the two street corner walls . As you work , slide the well-grooved bound of each roofing tile over the expose tongues of the last roofing tile to interlace the tiles firmly together . satisfy in between the border tiles with full - size tile in an expanding bomber blueprint , gradually extend the rows of border tiles and fanning tile out to cut across the total ceiling . observe : To form around light reparation , bind the roofing tile up to the ceiling before apply adhesive . Mark and hack off the circumstances to be removed , then give adhesive and slue the roofing tile into position .
dance step 7 : keep setting tiles until you reach the far corner of the room . Before cutting boundary line roofing tile for the two far wall , measure the spread leave beyond the last full tile . Mark and cut edge tiles along these walls one by one to verify they outfit the gap .
Step 8 : set up cove molding along the boundary of the roof .
Some ceilings are too uneven or badly damaged to install tile directly on them . You need to use furring strips to even things out . Instructions for doing this are in the next section .
Installing Tile on Furring Strips
To install tile over an uneven or seriously damaged roof , nail furring strip slip across the ceiling .
stair 1 : turn up each cap joist in the elbow room , and mark them on the cap . Nail 1 X 2 or 1 X 3 furring strip strip at right angles across the joists and along the edges of the ceiling with 6d common nail , 12 inches apart from pith to center . Use a carpenter ' square to ensure the strips are even and properly angled . Cut the flight strip to fit .
Step 2 : To differentiate the argument from the start out corner for the niche roofing tile and the first two border quarrel , carefully snap a shabu line of reasoning each way on the furring strip show . Trim tiles to this dimension .
Step 3 : Attach roofing tile to the furring strip using a heavy - tariff stapler and staple of a duration specify by the tile producer . basic at an angle through each tile ’s grooved edge , then slide in the next tile ’s tongued edge to interlock the tile .
Step 4 : abridge the recession roofing tile and put it into place , grooved side toward the center of the way and center on the furring strips . Staple it to the furring strip strips , setting three staples along each peril well-grooved boundary . Nail the other two side firmly into place with 4d vernacular nail , as close to the wall as potential .
Step 5 : Continue across the room , setting perimeter tiles and then fill in with full tiles , slide new tiles in to operate over old 1 as you go . Staple each raw tile with three staples along each grooved sharpness .
stride 6 : tighten border tiles into place at the bulwark , tug three nail along each trimmed tongue edge , as close to the wall as possible . These nail will be covered by modeling . Trim and put border tiles for the far walls one by one as you work .
Step 7 : Install cove moulding along the edges of the cap if necessary .
Now we ’ve covered the two most uncouth ways of tiling directly over an existing ceiling . Time to beautify that way .